AI data centers draw far more electricity per rack than the previous generation and run too hot for air alone. Generators, grid equipment and liquid-cooling suppliers are the physical limit on how fast capacity can be added.

CompanyTicker
Vistra
Power generator, including nuclear, signing long-term supply deals with data centers.
VST
Constellation Energy
Largest US nuclear fleet; power-purchase agreements with data-center operators.
CEG
GE Vernova
Gas turbines and grid equipment for new data-center power.
GEV
Eaton
Electrical distribution and power-quality equipment inside data centers.
ETN
Vertiv
Power and liquid-cooling infrastructure for AI racks.
VRT

How power companies earn from AI

AI racks draw several times the electricity of the previous generation and run too hot for air cooling, so the physical limit on the build-out is power and heat rather than chips. GE Vernova sells gas turbines and grid equipment; Vistra and Constellation sell electricity, increasingly under 15-20 year contracts with data-center operators; Eaton sells the switchgear and distribution inside the building; Vertiv sells the power and liquid-cooling systems at the rack.

Only Vertiv is close to a pure data-center company. The generators and the industrials sell to utilities, factories and aircraft as well, and they report data-center exposure as orders or as a share of sales, not as revenue. That is why four of the five are rated partial. Watch orders and backlog here; revenue lags them by years because turbines and power plants are built slowly.

Editorial, written from the reported figures on each company page. Company names link to those pages: VST, CEG, GEV, ETN, VRT.

The numbers right now

Reported by the companies; each line links to the release or filing it comes from.

What to watch in power

  • Contract announcements with named data-center counterparties and megawatt figures; most releases in this category still do not name the customer. source
  • GE Vernova's turbine slot count against its 125 GW year-end target; that queue is the hard constraint on new gas-fired capacity. source
  • Whether Vertiv's backlog keeps growing as fast as its revenue; a backlog that flattens while sales rise is the early sign of a slower build. source